(click and hold cursor on photo, then move to right or left) (1) (2) (3)

ColoMax's facilities are among the first Internet Data Centers (IDC) to utilize continuous power supply (CPS) online generators. These state-of-the-art generators are part of an overall power system that cleans and conditions commercial electrical power to remove any irregularities in the signal. All power is run through the CPS generators before being passed into the facility, by first building up momentum in the high-efficiency turbine. The momentum in the turbine ensures continuous power while the back-up generators, if needed, come on-line. This produces a seamless, continuous source of power. The back-up diesel generators can power the facility at full power for approximately 40 hours before re-supply is necessary.